fix(renovate): raise memory cap to 3g + alert on failed runs (#87) #88

Sammanfogat
supernaut sammanfogade 1 incheckning från renovate-oom-fix in i main 2026-07-17 20:29:32 +00:00
Ägare

Fixes #87. The nightly Renovate run has been OOM-killed (exit 137) at the 1.5 GiB container cap every night since 2026-07-11 — dying exactly at bitborg-web (repo 4/5), so bitborg-web and the tenant repo after it silently got no updates while earlier repos looked fine.

  • renovate_memory_max: 1.5g → 3g (peak RSS pinned at exactly the old cap on every failed run; 1.5g was already borderline before the failures started).
  • New RenovateRunFailed alert on gitborg_renovate_last_run_status != 0 — the metric was added for exactly this (tenant-Renovate plan §3.2) but nothing watched it, which is how 7 consecutive failures went unnoticed.

After merge+apply: next nightly run should process bitborg-web and open all pending PRs at once (the "create all" dashboard checkbox is already ticked). Verify gitborg_renovate_last_run_status returns 0 and the bitborg-web dashboard body refreshes.

Fixes #87. The nightly Renovate run has been OOM-killed (exit 137) at the 1.5 GiB container cap every night since 2026-07-11 — dying exactly at bitborg-web (repo 4/5), so bitborg-web and the tenant repo after it silently got no updates while earlier repos looked fine. - `renovate_memory_max: 1.5g → 3g` (peak RSS pinned at exactly the old cap on every failed run; 1.5g was already borderline before the failures started). - New `RenovateRunFailed` alert on `gitborg_renovate_last_run_status != 0` — the metric was added for exactly this (tenant-Renovate plan §3.2) but nothing watched it, which is how 7 consecutive failures went unnoticed. After merge+apply: next nightly run should process bitborg-web and open all pending PRs at once (the "create all" dashboard checkbox is already ticked). Verify `gitborg_renovate_last_run_status` returns 0 and the bitborg-web dashboard body refreshes.
supernaut lade till 1 incheckning 2026-07-17 16:42:14 +00:00
fix(renovate): raise memory cap to 3g + alert on failed runs (#87)
Alla kontroller lyckades
ci / ci (pull_request) Successful in 1m26s
e5383a47df
supernaut sammanfogade incheckning 26330b9884 till main 2026-07-17 20:29:32 +00:00
supernaut tog bort grenen renovate-oom-fix 2026-07-17 20:29:33 +00:00
Logga in för att delta i denna konversation.
Inga granskare
Ingen milstolpe
Inget projekt
Inga tilldelade
1 deltagare
Notiser
Förfallodatum
Förfallodatumet är ogiltigt eller utanför gränserna. Använd formatet "åååå-mm-dd".

Inget förfallodatum satt.

Beroenden

Inga beroenden satta

Referens
bitborg/bitborg-infra!88
Ingen beskrivning angiven.